A DA cost estimate report is a certified summary of what a proposed development will cost to build, used by councils to set fees and contributions.
What a DA cost estimate report is
A DA cost estimate report is a certified statement of what a proposed development will cost to build. When you lodge a development application in NSW, the council asks for an estimate of what the development will cost. For smaller jobs that is usually a cost summary from a suitably qualified person; above a set threshold, councils ask for a detailed cost report from an independent quantity surveyor.
It is not a builder’s quote. It is an independent estimate prepared by a Certified Quantity Surveyor from the drawings and the specification, so the council can rely on a single, defensible construction cost figure. That figure then becomes the reference point for everything the council calculates from the development.
Why councils ask for it
Councils use the construction cost as the basis for a number of charges. Development contributions under section 7.12 of the planning Act (formerly section 94A), DA fees and the long service levy are often calculated from the estimated cost of the development, so the council needs a figure it can trust.
A QS-certified report gives them that confidence, because it has been measured by someone who does this work professionally rather than a number written on a form. Getting it right means you are not overpaying contributions on an inflated figure, and you are not caught out by an underestimate that the council queries later. The thresholds and the exact requirement vary from council to council, so it is worth checking what your specific council asks for.
What the report includes
A DA cost estimate report breaks the build down into its main parts rather than giving one vague total.
- Demolition and site preparation.
- The structure, including the building works.
- Services and external works.
- Finishes and the fit-out where relevant.
- A total that the council can use for its calculations.
Each line is measured and priced at current rates, so the whole document is transparent and easy for a council officer to follow. That transparency matters, because it means the officer can see exactly how the total was reached rather than having to take it on trust. If the development has multiple stages, we can break the cost down by stage so the council can see how the numbers change over time.
What to send your quantity surveyor
To prepare the report we need a clear set of inputs. Send us the architectural drawings, the scope of works and a note on the intended finishes, and we can usually get started straight away.
The more complete those three things are, the faster the report comes back. If the design changes mid-way, tell us early, because a revised cost needs a revised report. We can often work from electronic drawings, so there is no need to print and post anything, and we can tell you if the council has asked for something that does not apply to your project.
Turnaround and fee
A cost report is usually turned around quickly once we have the drawings and scope, and the fee is fixed and agreed with you before any work starts. There is no hourly billing and no surprise at the end. We confirm the fee and the expected delivery date before we start, so you can plan your application around it.
Because every project is different, we quote each one individually rather than publish a price that would not fit your job. You know the cost before we begin, the same way the council knows the construction cost before it sets your fees. You can find out more at our cost planning and DA reports page.
A worked example
Imagine you are lodging a DA for a small duplex in a Sydney council area. The council asks for a cost estimate prepared by a suitably qualified person, and you want a figure that will not be queried, so you send us the drawings, the scope and the finishes.
We measure the build and prepare a DA cost estimate report that the council accepts as the basis for its contributions and fees. Because the figure is certified and transparent, there is nothing to re-work when the assessment officer reviews the file, and the application keeps moving rather than stalling on a queried number.
Frequently asked questions
Do all councils require a cost report?
Every DA needs a cost estimate, but the form depends on the value. Smaller jobs usually need only a cost summary, while larger ones need a detailed report from an independent quantity surveyor. Your council’s website lists its thresholds.
Is a builder’s quote good enough?
Below the threshold some councils accept a builder’s quote or a simple cost summary. Above it, a QS-certified report is usually required, because a quote reflects one builder’s price while a DA cost estimate report is measured independently from the drawings.
How long does it take?
Most reports are turned around quickly once we have the drawings and scope, and the fee is fixed and agreed before we start.